For the main contractor OTV, the company CMC Ekocon took care of supplying and installing the electrical and air conditioning system. At the same time, the company installed the hydromechanical equipment in the system for mechanical pre-treatment of wastewater; a part of equipment for mud treatment; as well as supplied and installed all the necessary pipe connections.
Project — Central waste water treatment plant at the river Vrtojbica
In March 2016, the project of carrying out mechanical and electrical installations in the central waste water treatment plant (WWTP) Nova Gorica with the capacity of 50.500 PE has concluded.