Language:

Clever ideas and excellent implementation of clear solutions are fundamental to successful project realization.

 
 
 
 
 
 

Archive

 
Sort by:
 
  • Irrigation system Kalce – Naklo

    21.03.2013

    In the spring of 2013, we accomplished the extension of the irrigation system Kalce – Naklo. We performed mechanical and electrical works on approx. 12 km of new PEHD pipelines (d450-d90), and upgraded the electrical/mechanical equipment of the existing pumping/filtering facility to adequate capacity.
    More about ...
     
  • Renovation of the swimming pool facility Tivoli

    01.07.2012

    Together with our partner company – DARRTECH d.o.o. – we concluded phase 1 of the project for renovation of the swimming pool facility – the school indoor swimming pool in Tivoli. The works included complete renovation / replacement of: the pressure-, overflow- and drainage installation, balance tanks and the washing pool, filter replacement and replacement of the complete control system, analysis and preparation of pool water.
    More about ...
     
  • Renovation of the hydrant network of Karavanke tunnel

    16.09.2011

    At the beginning of August 2011, CMC Ekocon d.o.o. — as the lead partner, together with the company Komunalne gradnje Grosuplje d.o.o. — began with the renovation of the hydrant network outside and inside the Karavanke tunnel.
    More about ...
     
  • Hrastnik Glassworks

    15.08.2009

    We supplied the materials and performed mechanical installation of the Victaulic system for cooling and process water in Hrastnik Glassworks.
    More about ...
     
  • Protection of the Mrzlek water source

    16.07.2009

    In 2009, we cooperated on the project "Protection of the Mrzlek water source and drinking water supply for the residents of Trnovsko - Banjška planota, Goriška Brda and Vipava valley"...
    More about ...
     
  • Litostroj Ulitki d.o.o.

    18.06.2009

    Implementation of the cooling system for the new ovens for heat-treatment of cast alloys using the Victaulic joining technology for pipes and fittings.
    More about ...
     
  • Central wastewater treatment plant Ljubljana

    24.01.2005

    We supplied and installed the entire electronic, mechanical and electrical equipment for the company JP Vodovod - Kanalizacija d.o.o.
    More about ...
     
 
 
 

Contact

CMC GROUP d.o.o.
IOC Zapolje I/10
SI-1370 Logatec

T: +386 1 759 08 00
F: +386 1 759 08 01
E: info@cmc-group.si

 
 
 
I AGREE

Our website uses cookies for better user experience

By continuing to browse our website you agree to our use of cookies which helps us provide you with a good user experience on our website. We use Google Analytics for our own analytical purposes and it installs cookies for this purpose (delete GA cookies). More about cookies.